RN No. 097
Project Name DEG Tower (A) (REVISED)
Developer MGW Construction Ltd
Status on-going
Basement -
Storey 27
Building Height -
Location No.13/15, Phoe Sein Road, Bahan Township.
Region
State
Project Status
Architecture 1. Resubmit revised Architectural Drawing.(7.9.15)2. Documents Checking is finished.
Structure 1. Piling recommended. (18.5.15)
2. Foundation recommended. (9.6.15)
3. Send comments about shear wall, Adapt software. (9.6.15)
4. Send comments about beam by mail. (7.8.15)
5. Revised comment reply.(7.9.15)
6. Sent comment about revised data.
7. Remind Letter about CQHP comments. (8.10.15)
8. Remind Letter. (31.3.16)
9. Remind Letter. (9.5.16)
Electrical 1. Desig1. Design Checklist has finished on (1.10.2015).
2. Delay project.
ACMV 1. Design Checklist has finished on (1.10.2015).
2. Delay project.
Water Supply and Sanitation 1. Presentation(30.4.2015).
2. Comment sent on (18.5.2015).
3. Reminder sent on (18.6.2015).
4. Comments reply (2.9.2015).
5. Comment sent on (17.12.2015).
6. Delay project.