RN No. | 101 |
Project Name | Twin Centro |
Developer | Shwe Taung Co.,Ltd |
Status | on-going |
Basement | |
Storey | 15 |
Building Height | |
Location | Baho Road, Sanchaung Township. |
Region | |
State |
YCDC Letter Date | |
Load Test/Deep Ex/Foundation/Superstructure/MEP | |
Project Status | |
Architecture | 1. Recommended old design on ( 4.6.2013). 2. YCDC letter for revised (28.4.2016). 3. Document checking is finished. 4. Recommended for Structure. (26.6.17) |
Structure | 1. Recommended old design on ( 4.6.2013). 2. YCDC letter for revised (28.4.2016). 3. Presentaion (28.5.2016). 4. Recommendation for revised design on (26.6.2017). |
Electrical | 1. Recommended old design on ( 4.6.2013). 2. Not submitted revised design drawing. |
ACMV | 1. Recommended old design on ( 4.6.2013). 2. Not submitted revised design drawing. |
Water and Sanitation | 1. Recommended old design on ( 4.6.2013). 2. YCDC letter for revised (28.4.2016). 3.Presentaion (17.7.2017). 4.Recommended revised design on (30.10.2017). |