RN No. | 196 |
Project Name | NO(75)Kyiek ka San |
Developer | Yadanar Myaing Construction Co,.ltf |
Status | on-going |
Basement | |
Storey | 25 |
Building Height | |
Location | No(75)Kyiek kasan Road,Tarmwe Township |
Region | |
State |
Project Status | |
Architecture | 1. Presented Conceptual Architectural Presentation for Pile load test.(22.8.2016) 2. Conceptual Architectural drawing checking is finished. 3. Not Submitted yet final drawing. 4. Sent comment to company to submit final drawing. (21.5.18) 5. Remind letter (7.1.2019) |
Structure | 1. DE & ULT recommended (12.12.2016). 2. Remind letter for ULT report (21.3.2017). 3. Send comments (20.3.2017). 4. Comments reply (5.5.2017). 5. Remind letter for ULT (29.5.2017) 6. Checking finished by TAG and waiting for PLT reports. 7. Resubmit Final documents. (31.1.2018) 8. Checking finished by TAG and waiting for PLT reports. 9. Remind Letter (9.4.2018) 10. Remind letter (7.1.2019) |
Electrical | 1. Sent the 7th remind letter to submit the design drawing on(12.11.18) 2. Submitted design drawing and calculation on (26.9.2018). 3. Not yet presented by developer. |
ACMV | 1. Sent the 7th remind letter to submit the design drawing on(12.11.18) |
Water and Sanitation | 1. Submitted the design drawing and document on (26.9.2018). |